turbines

  • Reduced scale model testing for hydropower projects

    15 July 2017 by Dr Loïc Andolfatto, Mech. Eng. MSc. ENS de Cachan, France, Head of EPFL LMH Testing Group, Expert for IEC TC4/WG33 and Prof. François Avellan, Eng. Dr Université d’Aix Marseille 2, Director of EPFL LMH, Convenor of IEC TC4 Maintenance Team 32
    Hydropower projects are usually very large, designed to last for decades and then to be refurbished. Owing to the huge costs involved and the need to achieve the best possible results and efficiency, extensive testing of...